ITAC Assessment: NV0099
ITAC logo
ITAC Assessment: NV0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Asphalt Paving Mixtures
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area
n/a
Annual Production 375,000
ton
Production Hrs. Annual 1,190
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,717 1,611,958
kWh
Electricity Demand $108,635 11,719
kW-mo/yr
Electricity Fees $4,522 -
LPG $198,222 37,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $5,521 $33,286 $1,691
41,032
kWh
$3,824
-
kW-mo/yr
$6 - -
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $5,867 $30,000 - - - $5,867
-
MMBtu
-
03 2.2511: Insulate bare equipment $179 $436 - - - $179
-
MMBtu
-
04 2.7134: Use photocell controls $775 $290 $479
11,430
kWh
$294
-
kW-mo/yr
$2 - -
05 3.5311: Recover and reuse waste material $(-536.0) - - - - - $(-536.0)
TOTAL RECOMMENDED $11,806 $64,012 $2,170
52,462
kWh
$4,118
-
kW-mo/yr
$8 $6,046
-
MMBtu
$(-536.0)
TOTAL IMPLEMENTED $5,700 $33,722 $1,691
41,032
kWh
$3,824
-
kW-mo/yr
$6 $179
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs