| Assessment Year | 2021 |
|---|---|
| Principal Product | Plastic Fence, Deck, and Railing |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
98,410
ft2
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $177,647 | 5,730,548 |
kWh
|
$0.031 | |
| Electricity Demand | $297,262 | 17,007 |
kW-mo/yr
|
$17.48 | |
| Natural Gas | $23,275 | 3,630 |
MMBtu
|
$6.41 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,347 | 7,052 |
Tgal
|
$0.90 | |
| Water Disposal | $2,081 | 1,095 |
Tgal
|
$1.90 | |
| TOTAL YEARLY COSTS | $506,612 | ||||
| RECOMMENDED SAVINGS* | $121,098 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $15,338 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $74,696 | $154,720 |
$74,696
2,425,199
kWh
|
- | - | - | - | - | |
| 02 | 3.4114: Replace city water with recycled water via cooling tower | $20,793 | $13,100 |
$11,516
371,498
kWh
|
$9,276
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $10,271 | $16,980 |
$207
6,720
kWh
|
$164
-
kW-mo/yr
|
- | - | - | $9,900 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,345 | $11,175 |
$2,803
90,413
kWh
|
$4,214
-
kW-mo/yr
|
- | $328 | - | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $4,782 | $15,170 | - | - |
$4,782
-
MMBtu
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,211 | $2,500 |
$3,711
120,509
kWh
|
- | - | $(-400.0) | $(-100.0) | - | |
| TOTAL RECOMMENDED | $121,098 | $213,645 |
$92,933
3,014,339
kWh
|
$13,654
-
kW-mo/yr
|
$4,782
-
MMBtu
|
$(-72.0) | $(-100.0) | $9,900 | ||
| TOTAL IMPLEMENTED | $15,338 | $28,845 |
$6,514
210,922
kWh
|
$4,214
-
kW-mo/yr
|
$4,782
-
MMBtu
|
$(-72.0) | $(-100.0) | - | ||