ITAC Assessment: NL0045
ITAC logo
ITAC Assessment: NL0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Communication and Radio Equipment
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 135,000
ft2
Annual Production 2,500
units
Production Hrs. Annual 2,080
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,231 1,368,223
kWh
Electricity Demand $107,537 5,085
kW-mo/yr
Electricity Fees $7,735 -
Natural Gas $37,097 5,539
MMBtu
TOTAL YEARLY COSTS $186,600
RECOMMENDED SAVINGS* $32,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,177 $32,070 $1,705
68,183
kWh
$7,870
-
kW-mo/yr
- $15,602 -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $4,032 $15,126 - - $4,032
-
MMBtu
- -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,371 $500 - - $1,371
-
MMBtu
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $967 $672 - $967
-
kW-mo/yr
- - -
05 2.8123: Pay utility bills on time $445 $130 - - - - $445
06 2.7135: Install occupancy sensors $256 $565 $256
10,234
kWh
- - - -
TOTAL RECOMMENDED $32,248 $49,063 $1,961
78,417
kWh
$8,837
-
kW-mo/yr
$5,403
-
MMBtu
$15,602 $445
TOTAL IMPLEMENTED $25,878 $32,765 $1,961
78,417
kWh
$7,870
-
kW-mo/yr
- $15,602 $445
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs