Assessment Year | 2017 |
---|---|
Principal Product | Refrigeration and Heating Equipment |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 430 |
Plant Area |
234,000
ft2
|
Annual Production | 42,000
units
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $244,817 | 4,382,000 |
kWh
|
$0.056 | |
Electricity Demand | $96,474 | 11,963 |
kW-mo/yr
|
$8.06 | |
Natural Gas | $63,563 | 15,196 |
MMBtu
|
$4.18 | |
Waste Disposal Costs | |||||
Water Usage | $13,603 | 6,273 |
Tgal
|
$2.17 | |
Water Disposal | $19,357 | 6,274 |
Tgal
|
$3.09 | |
TOTAL YEARLY COSTS | $437,813 | ||||
RECOMMENDED SAVINGS* | $50,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $45,100 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,693 | $189,100 |
$24,279
433,550
kWh
|
$8,415
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,416 | - | - |
$5,416
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $5,079 | $12,500 | - | - |
$5,079
-
MMBtu
|
- | - | - | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,800 | - | - | - | - |
$3,800
-
Tgal
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,190 | $4,500 |
$3,640
65,000
kWh
|
- | - | - | $(-350.0) | $(-100.0) | |
TOTAL RECOMMENDED | $50,178 | $206,100 |
$27,919
498,550
kWh
|
$13,831
-
kW-mo/yr
|
$5,079
-
MMBtu
|
$3,800
-
Tgal
|
$(-350.0) | $(-100.0) | ||
TOTAL IMPLEMENTED | $45,100 | $193,600 |
$27,919
498,550
kWh
|
$13,831
-
kW-mo/yr
|
- |
$3,800
-
Tgal
|
$(-350.0) | $(-100.0) |