ITAC Assessment: NL0015
ITAC logo
ITAC Assessment: NL0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Refrigeration and Heating Equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 430
Plant Area 234,000
ft2
Annual Production 42,000
units
Production Hrs. Annual 4,500
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,817 4,382,000
kWh
Electricity Demand $96,474 11,963
kW-mo/yr
Natural Gas $63,563 15,196
MMBtu
Waste Disposal Costs
Water Usage $13,603 6,273
Tgal
Water Disposal $19,357 6,274
Tgal
TOTAL YEARLY COSTS $437,813
RECOMMENDED SAVINGS* $50,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,693 $189,100 $24,279
433,550
kWh
$8,415
-
kW-mo/yr
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,416 - - $5,416
-
kW-mo/yr
- - - -
03 2.2437: Recover waste heat from equipment $5,079 $12,500 - - $5,079
-
MMBtu
- - -
04 3.4116: Meter recycled water (to reduce sewer charges) $3,800 - - - - $3,800
-
Tgal
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,190 $4,500 $3,640
65,000
kWh
- - - $(-350.0) $(-100.0)
TOTAL RECOMMENDED $50,178 $206,100 $27,919
498,550
kWh
$13,831
-
kW-mo/yr
$5,079
-
MMBtu
$3,800
-
Tgal
$(-350.0) $(-100.0)
TOTAL IMPLEMENTED $45,100 $193,600 $27,919
498,550
kWh
$13,831
-
kW-mo/yr
- $3,800
-
Tgal
$(-350.0) $(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs