ITAC Assessment: ND0042
ITAC logo
ITAC Assessment: ND0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HYDRAULIC PRESSES
NAICS
n/a
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $5
M
to 10
M
# of Employees 73
Plant Area
n/a
Annual Production 4,380
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,022 983,001
kWh
Natural Gas $21,079 5,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,027 $350 $6,027
74,150
kWh
- -
02 2.4133: Use most efficient type of electric motors $759 $7,880 $759
9,379
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $305 $10,000 $639
7,913
kWh
- $(-334.0)
04 2.7492: Use proper thickness of insulation on building envelope $186 $436 - $186
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $241 $88 $241
1,172
kWh
- -
TOTAL RECOMMENDED $7,518 $18,754 $7,666
92,614
kWh
$186
-
MMBtu
$(-334.0)
TOTAL IMPLEMENTED $7,518 $18,754 $7,666
92,614
kWh
$186
-
MMBtu
$(-334.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs