ITAC Assessment: ND0012
ITAC logo
ITAC Assessment: ND0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CANDIES
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 1,530,000
lb
Production Hrs. Annual 2,652
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,769 262,896
kWh
Natural Gas $12,445 2,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,398 $400 - $1,398
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $200 $468 $200
2,931
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $280 $250 $280
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8 - $40
586
kWh
- $(-32.0)
TOTAL RECOMMENDED $1,886 $1,118 $520
3,517
kWh
$1,398
-
MMBtu
$(-32.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs