ITAC Assessment: NC0600
ITAC logo
ITAC Assessment: NC0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Spring mattresses
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 150,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,761 1,824,618
kWh
Electricity Demand $19,995 4,473
kW-mo/yr
TOTAL YEARLY COSTS $132,756
RECOMMENDED SAVINGS* $12,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,705 $10,366 $1,682
27,212
kWh
$612
-
kW-mo/yr
- $411
02 2.7135: Install occupancy sensors $191 $850 $191
3,085
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $383 $200 $433
7,000
kWh
$150
-
kW-mo/yr
$(-100.0) $(-100.0)
04 2.4239: Eliminate or reduce compressed air usage $650 $1,200 $650
10,520
kWh
- - -
05 2.8114: Change rate schedules or other changes in utility service $8,798 $500 $8,798
-
kWh
- - -
TOTAL RECOMMENDED $12,727 $13,116 $11,754
47,817
kWh
$762
-
kW-mo/yr
$(-100.0) $311
TOTAL IMPLEMENTED $3,929 $12,616 $2,956
47,817
kWh
$762
-
kW-mo/yr
$(-100.0) $311
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs