Assessment Year | 2012 |
---|---|
Principal Product | Potato chips |
NAICS | 311919: Other Snack Food Manufacturing |
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $100 M to 500M |
# of Employees | 220 |
Plant Area |
106,000
ft2
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $281,386 | 4,205,440 |
kWh
|
$0.067 |
Electricity Demand | $94,806 | 8,218 |
kW-mo/yr
|
$11.54 |
Natural Gas | $757,168 | 177,285 |
MMBtu
|
$4.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,366 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $42,880 | $75,000 |
$(-8,830.0)
(-132,000)
kWh
|
$(-2,770.0)
-
kW-mo/yr
|
- | - | $(-2,400.0) | $56,880 | |
02 | 2.2437: Recover waste heat from equipment | $19,522 | $100,000 | - | - |
$19,522
-
MMBtu
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $2,746 | $5,600 | - | - |
$2,746
-
MMBtu
|
- | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,740 | $400 |
$1,325
19,800
kWh
|
$415
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $880 | $200 |
$989
14,784
kWh
|
$311
-
kW-mo/yr
|
- | $(-300.0) | - | $(-120.0) | |
TOTAL RECOMMENDED | $67,768 | $181,200 |
$(-6,516.0)
(-97,416)
kWh
|
$(-2,044.0)
-
kW-mo/yr
|
$22,268
-
MMBtu
|
$(-300.0) | $(-2,400.0) | $56,760 | ||
TOTAL IMPLEMENTED | $5,366 | $6,200 |
$2,314
34,584
kWh
|
$726
-
kW-mo/yr
|
$2,746
-
MMBtu
|
$(-300.0) | - | $(-120.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs