ITAC Assessment: NC0200
ITAC logo
ITAC Assessment: NC0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cotton/polyester yarn
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 200,000
ft2
Annual Production 28,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,142,058 32,594,373
kWh
Electricity Demand $469,944 52,913
kW-mo/yr
Electricity Fees $(-68,603.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $20,439 $27,000 n/a $17,739
657,093
kWh
$2,700
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,705 $51,300 n/a $6,372
236,225
kWh
$2,333
-
kW-mo/yr
- -
03 2.2625: Chill water to the highest temperature possible $921 $1,000 n/a $508
18,757
kWh
$813
-
kW-mo/yr
- $(-400.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $30,871 $10,600 n/a $22,611
837,632
kWh
$8,260
-
kW-mo/yr
- -
05 3.4155: Meter waste water $15,526 $7,025 n/a - - $15,526
-
Tgal
-
TOTAL RECOMMENDED $76,462 $96,925 $47,230
1,749,707
kWh
$14,106
-
kW-mo/yr
$15,526
-
Tgal
$(-400.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs