ITAC Assessment: NC0173
ITAC logo
ITAC Assessment: NC0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Lace for apparel and home furnishings
NAICS
n/a
SIC 2258: Lace and Warp Knit Fabric Mills
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 138,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,610 3,573,857
kWh
Electricity Demand $88,597 9,429
kW-mo/yr
Electricity Fees $20,150 -
Natural Gas $102,896 22,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $311 $500 $198
6,741
kWh
$113
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $2,143 $875 $721
24,619
kWh
$1,422
-
kW-mo/yr
- - - -
03 2.7241: Install outside air damper / economizer on hvac unit $7,486 $27,000 $7,486
258,206
kWh
- - - - -
04 2.1133: Adjust burners for efficient operation $1,211 $800 - - $1,211
-
MMBtu
- - -
05 3.1191: Change procedures / equipment / operating conditions $235 - - - $175
-
MMBtu
- $60
-
Tgal
-
06 3.5313: Increase amount of waste recovered for resale $375 $500 - - - $375
-
lb
- -
07 4.451: Add additional production shift $6,000 $1,000 - - - - - $6,000
TOTAL RECOMMENDED $17,761 $30,675 $8,405
289,566
kWh
$1,535
-
kW-mo/yr
$1,386
-
MMBtu
$375
-
lb
$60
-
Tgal
$6,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs