Assessment Year | 1999 |
---|---|
Principal Product | bath and kitchen faucets |
NAICS |
n/a
|
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
280,000
ft2
|
Annual Production | 11,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $986,707 | 30,266,706 |
kWh
|
$0.033 |
Electricity Demand | $611,763 | 54,379 |
kW-mo/yr
|
$11.25 |
Electricity Fees | $17,938 | - |
|
- |
Natural Gas | $180,409 | 45,410 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $564,527 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $526,046 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,453 | $15,000 |
$9,713
298,066
kWh
|
$4,590
-
kW-mo/yr
|
$(-4,850.0)
-
MMBtu
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $27,013 | $1,295 |
$25,798
791,325
kWh
|
$1,215
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $461,046 | $1,000,000 |
$185,996
5,705,451
kWh
|
$161,257
-
kW-mo/yr
|
$(-56,207.0)
-
MMBtu
|
- | $170,000 | - | |
04 | 2.7313: Recycle air for heating, ventilation and air conditioning | $65,000 | $80,000 |
$32,625
1,000,879
kWh
|
$30,375
-
kW-mo/yr
|
- | - | $(-4,000.0) | $6,000 | |
05 | 3.1221: Use reactive rinsing | $2,015 | $325 | - | - | - |
$2,015
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $564,527 | $1,096,620 |
$254,132
7,795,721
kWh
|
$197,437
-
kW-mo/yr
|
$(-61,057.0)
-
MMBtu
|
$2,015
-
Tgal
|
$166,000 | $6,000 | ||
TOTAL IMPLEMENTED | $526,046 | $1,080,000 |
$218,621
6,706,330
kWh
|
$191,632
-
kW-mo/yr
|
$(-56,207.0)
-
MMBtu
|
- | $166,000 | $6,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs