Assessment Year | 1997 |
---|---|
Principal Product | Dry type electrical transformers |
NAICS |
n/a
|
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $50 M to 100M |
# of Employees | 275 |
Plant Area |
127,368
ft2
|
Annual Production | 45,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $148,497 | 4,887,749 |
kWh
|
$0.030 |
Electricity Demand | $108,057 | 10,762 |
kW-mo/yr
|
$10.04 |
Natural Gas | $88,319 | 15,388 |
MMBtu
|
$5.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,009 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $21,317 | $8,000 |
$29,250
975,381
kWh
|
$17,535
-
kW-mo/yr
|
$(-25,468.0)
-
MMBtu
|
- | - | - | - | |
02 | 2.2424: Use heat in flue gases to preheat products or materials | $3,966 | $2,000 | - | - |
$3,966
-
MMBtu
|
- | - | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $2,624 | $320 |
$1,431
47,773
kWh
|
$1,193
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $2,893 | $1,300 | - | - |
$2,893
-
MMBtu
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $3,005 | - |
$1,192
39,859
kWh
|
$1,813
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $2,834 | $2,500 |
$2,834
94,373
kWh
|
- | - | - | - | - | - | |
07 | 3.4153: Use counter current rinsing to reduce waste water | $965 | $610 |
$(-7.0)
(-293)
kWh
|
- | - |
$972
-
Tgal
|
- | - | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,063 | $5,200 | - | - | - | - |
$1,063
-
lb
|
$500 | $(-500.0) | |
TOTAL RECOMMENDED | $38,667 | $19,930 |
$34,700
1,157,093
kWh
|
$20,541
-
kW-mo/yr
|
$(-18,609.0)
-
MMBtu
|
$972
-
Tgal
|
$1,063
-
lb
|
$500 | $(-500.0) | ||
TOTAL IMPLEMENTED | $28,009 | $13,520 |
$31,873
1,063,013
kWh
|
$20,541
-
kW-mo/yr
|
$(-25,468.0)
-
MMBtu
|
- |
$1,063
-
lb
|
$500 | $(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs