ITAC Assessment: NC0112
ITAC logo
ITAC Assessment: NC0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Cotton and synthetic yarns
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $635,047 18,285,463
kWh
Electricity Demand $460,575 40,940
kW-mo/yr
Electricity Fees $(-228,054.0) -
Natural Gas $10,288 1,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.7124: Make a practice of turning off lights when not needed $9,780 - n/a $6,378
63,013
kWh
$3,402
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,183 $397 n/a $2,717
78,253
kWh
$1,466
-
kW-mo/yr
- - - -
03 2.2694: Use highest temperature for chilling or cold storage $1,601 $20 n/a $987
28,429
kWh
$614
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,698 $300 n/a $7,410
213,365
kWh
$3,288
-
kW-mo/yr
- - - -
05 3.5311: Recover and reuse waste material $16,220 $260 n/a - - $(-3,780.0) - $20,000 -
06 2.8114: Change rate schedules or other changes in utility service $7,750 $10,280 n/a - - - - - $7,750
-
Tgal
07 4.511: Expand operations into unused space $60,000 $1,080 n/a - - - $60,000 - -
TOTAL RECOMMENDED $110,232 $12,337 $17,492
383,060
kWh
$8,770
-
kW-mo/yr
$(-3,780.0) $60,000 $20,000 $7,750
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs