ITAC Assessment: NC0105
ITAC logo
ITAC Assessment: NC0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bearings and valve seats
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 100,000
ft2
Annual Production 468,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,757 14,081,184
kWh
Electricity Demand $230,838 24,350
kW-mo/yr
Electricity Fees $18,690 -
Natural Gas $59,273 21,481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,316 $5,062 $2,994
103,165
kWh
$1,322
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $1,852 $375 $1,852
63,892
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $449 $2,100 $214
7,327
kWh
$85
-
kW-mo/yr
- - - $150
04 2.7111: Reduce illumination to minimum necessary levels $6,194 $1,520 $4,441
153,283
kWh
$1,753
-
kW-mo/yr
- - - -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $3,174 $11,500 $2,423
83,529
kWh
$751
-
kW-mo/yr
- - - -
06 2.3191: Use demand controller or load shedder $2,508 $3,000 - $2,508
-
kW-mo/yr
- - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,655 $5,125 $6,514
203,400
kWh
$534
-
kW-mo/yr
$(-2,393.0)
-
MMBtu
- - -
08 2.4133: Use most efficient type of electric motors $5,562 $5,464 $3,606
124,267
kWh
$1,956
-
kW-mo/yr
- - - -
09 3.8121: Cover containers to minimize evaporative losses $702 $500 - - - $702
-
gal
- -
10 3.3128: Utilize other methods to remove contaminants $826 $500 - - - $826
-
gal
- -
11 3.5316: Contract a wood pallet recycling company $225 $200 - - - - $225
-
lb
-
TOTAL RECOMMENDED $30,463 $35,346 $22,044
738,863
kWh
$8,909
-
kW-mo/yr
$(-2,393.0)
-
MMBtu
$1,528
-
gal
$225
-
lb
$150
TOTAL IMPLEMENTED $2,508 $3,000 - $2,508
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs