Assessment Year | 1996 |
---|---|
Principal Product | Bearings and valve seats |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
100,000
ft2
|
Annual Production | 468,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $366,757 | 14,081,184 |
kWh
|
$0.026 |
Electricity Demand | $230,838 | 24,350 |
kW-mo/yr
|
$9.48 |
Electricity Fees | $18,690 | - |
|
- |
Natural Gas | $59,273 | 21,481 |
MMBtu
|
$2.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,508 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,316 | $5,062 |
$2,994
103,165
kWh
|
$1,322
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $1,852 | $375 |
$1,852
63,892
kWh
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $449 | $2,100 |
$214
7,327
kWh
|
$85
-
kW-mo/yr
|
- | - | - | $150 | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $6,194 | $1,520 |
$4,441
153,283
kWh
|
$1,753
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,174 | $11,500 |
$2,423
83,529
kWh
|
$751
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.3191: Use demand controller or load shedder | $2,508 | $3,000 | - |
$2,508
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,655 | $5,125 |
$6,514
203,400
kWh
|
$534
-
kW-mo/yr
|
$(-2,393.0)
-
MMBtu
|
- | - | - | |
08 | 2.4133: Use most efficient type of electric motors | $5,562 | $5,464 |
$3,606
124,267
kWh
|
$1,956
-
kW-mo/yr
|
- | - | - | - | |
09 | 3.8121: Cover containers to minimize evaporative losses | $702 | $500 | - | - | - |
$702
-
gal
|
- | - | |
10 | 3.3128: Utilize other methods to remove contaminants | $826 | $500 | - | - | - |
$826
-
gal
|
- | - | |
11 | 3.5316: Contract a wood pallet recycling company | $225 | $200 | - | - | - | - |
$225
-
lb
|
- | |
TOTAL RECOMMENDED | $30,463 | $35,346 |
$22,044
738,863
kWh
|
$8,909
-
kW-mo/yr
|
$(-2,393.0)
-
MMBtu
|
$1,528
-
gal
|
$225
-
lb
|
$150 | ||
TOTAL IMPLEMENTED | $2,508 | $3,000 | - |
$2,508
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs