ITAC Assessment: NC0074
ITAC logo
ITAC Assessment: NC0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Built Air Handlers
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 188,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 3,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,931 1,830,891
kWh
Natural Gas $29,824 5,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $518 $210 $518
7,620
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $480 $556 $480
7,034
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,041 $1,134 $4,041
58,324
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,178 $1,710 $1,178
13,775
kWh
- - -
05 2.7492: Use proper thickness of insulation on building envelope $513 $1,200 $135
2,052
kWh
$378
-
MMBtu
- -
06 2.4322: Use or replace with energy efficient substitutes $1,347 $1,910 $1,347
8,206
kWh
- - -
07 3.4115: Recover and reuse cooling water $2,250 $3,500 $(-202.0)
2,931
kWh
- $2,502
-
Tgal
$(-50.0)
TOTAL RECOMMENDED $10,327 $10,220 $7,497
99,942
kWh
$378
-
MMBtu
$2,502
-
Tgal
$(-50.0)
TOTAL IMPLEMENTED $7,597 $6,164 $7,219
89,977
kWh
$378
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs