| Assessment Year | 2026 |
|---|---|
| Principal Product | medicinal vials |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 57 |
| Plant Area |
182,000
ft2
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 4,375
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $312,406 | 3,975,000 |
kWh
|
$0.079 | |
| Electricity Demand | $38,288 | 7,849 |
kW-mo/yr
|
$4.88 | |
| Natural Gas | $200,898 | 23,392 |
MMBtu
|
$8.59 | |
| Waste Disposal Costs | |||||
| Water Usage | $130,187 | 15,325 |
Tgal
|
$8.50 | |
| TOTAL YEARLY COSTS | $681,779 | ||||
| RECOMMENDED SAVINGS* | $252,869 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,493 | $600 |
$2,130
27,093
kWh
|
$363
-
kW-mo/yr
|
- | |
| 02 | 2.2625: Chill water to the highest temperature possible | $26,240 | - |
$26,240
333,858
kWh
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,954 | $1,000 | - | - |
$2,954
-
MMBtu
|
|
| 04 | 2.7135: Install occupancy sensors | $798 | $1,700 |
$798
10,147
kWh
|
- | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $11,132 | $80,000 | - | - |
$11,132
-
MMBtu
|
|
| 06 | 2.9114: Use solar heat to make electricty | $209,252 | $1,881,750 |
$209,252
2,662,245
kWh
|
- | - | |
| TOTAL RECOMMENDED | $252,869 | $1,965,050 |
$238,420
3,033,343
kWh
|
$363
-
kW-mo/yr
|
$14,086
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs