ITAC Assessment: MZ0395
ITAC logo
ITAC Assessment: MZ0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product medicinal vials
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 57
Plant Area 182,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,406 3,975,000
kWh
Electricity Demand $38,288 7,849
kW-mo/yr
Natural Gas $200,898 23,392
MMBtu
Waste Disposal Costs
Water Usage $130,187 15,325
Tgal
TOTAL YEARLY COSTS $681,779
RECOMMENDED SAVINGS* $252,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,493 $600 $2,130
27,093
kWh
$363
-
kW-mo/yr
-
02 2.2625: Chill water to the highest temperature possible $26,240 - $26,240
333,858
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,954 $1,000 - - $2,954
-
MMBtu
04 2.7135: Install occupancy sensors $798 $1,700 $798
10,147
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $11,132 $80,000 - - $11,132
-
MMBtu
06 2.9114: Use solar heat to make electricty $209,252 $1,881,750 $209,252
2,662,245
kWh
- -
TOTAL RECOMMENDED $252,869 $1,965,050 $238,420
3,033,343
kWh
$363
-
kW-mo/yr
$14,086
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs