ITAC Assessment: MZ0329
ITAC logo
ITAC Assessment: MZ0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product hand held surgical instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 111,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,177 1,124,400
kWh
Electricity Demand $15,567 4,751
kW-mo/yr
Natural Gas $9,768 1,312
MMBtu
TOTAL YEARLY COSTS $122,512
RECOMMENDED SAVINGS* $23,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,095

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $382 $240 $325
3,783
kWh
$56
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,529 $20,439 $3,157
36,707
kWh
$869
-
kW-mo/yr
$3,503
03 2.4239: Eliminate or reduce compressed air usage $540 $3,202 $453
5,262
kWh
$87
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $11,471 $60,924 $9,418
109,515
kWh
$2,053
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $583 $960 $583
6,770
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $983 $150 $805
9,365
kWh
$178
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,853 $4,331 $1,853
21,541
kWh
- -
TOTAL RECOMMENDED $23,341 $90,246 $16,594
192,943
kWh
$3,243
-
kW-mo/yr
$3,503
TOTAL IMPLEMENTED $9,095 $21,549 $4,545
52,842
kWh
$1,047
-
kW-mo/yr
$3,503
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs