Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Shot Blasters, Washers & Vibrator Equipment
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 52,000
ft2
Annual Production 210
units
Production Hrs. Annual 2,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,908 728,618
kWh
Electricity Demand $36,088 5,970
kW-mo/yr
TOTAL YEARLY COSTS $105,996
RECOMMENDED SAVINGS* $29,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $12,533 $24,500 $9,381
97,810
kWh
$3,152
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,790 $7,081 $4,334
45,191
kWh
$1,456
-
kW-mo/yr
03 2.7135: Install occupancy sensors $5,169 $10,500 $3,869
40,339
kWh
$1,300
-
kW-mo/yr
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,201 $3,250 - $3,201
-
kW-mo/yr
05 2.7134: Use photocell controls $1,385 $1,440 $936
9,765
kWh
$449
-
kW-mo/yr
06 2.4322: Use or replace with energy efficient substitutes $1,072 $2,400 $798
8,310
kWh
$274
-
kW-mo/yr
TOTAL RECOMMENDED $29,150 $49,171 $19,318
201,415
kWh
$9,832
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs