ITAC Assessment: MZ0188
ITAC logo
ITAC Assessment: MZ0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product aircraft parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 65,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 6,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,507 2,427,293
kWh
Electricity Demand $55,794 9,498
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,385 - - $19,385
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $2,967 $10,000 $2,967
37,606
kWh
-
03 2.2437: Recover waste heat from equipment $1,249 $1,000 $1,249
15,826
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $2,811 - $2,459
31,163
kWh
$352
-
kW-mo/yr
TOTAL RECOMMENDED $26,412 $11,000 $6,675
84,595
kWh
$19,737
-
kW-mo/yr
TOTAL IMPLEMENTED $23,445 $1,000 $3,708
46,989
kWh
$19,737
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs