ITAC Assessment: MZ0143
ITAC logo
ITAC Assessment: MZ0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $100
M
to 500
M
# of Employees 105
Plant Area 2,000,000
ft2
Annual Production 2,100,000
ton
Production Hrs. Annual 8,700
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,011,619 221,935,612
kWh
Electricity Demand $4,662,123 402,323
kW-mo/yr
Natural Gas $334,000 85,000
MMBtu
Coal $8,000,000 5,003,800
MMBtu
Other Energy $260,000 9,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,565,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $5,306,536 $18,000,000 $3,664,980
101,523,000
kWh
$1,641,556
-
kW-mo/yr
- -
02 3.1161: Eliminate/reduce an operation $218,015 - $150,573
4,171,000
kWh
$67,442
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $66,528 $339,300 $45,948
1,272,800
kWh
$20,580
-
kW-mo/yr
- -
04 4.445: Install equipment to move product $974,644 $3,131,120 $(-70,771.0)
(-1,960,488)
kWh
$(-31,125.0)
-
kW-mo/yr
$230,736
-
MMBtu
$845,804
TOTAL RECOMMENDED $6,565,723 $21,470,420 $3,790,730
105,006,312
kWh
$1,698,453
-
kW-mo/yr
$230,736
-
MMBtu
$845,804
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs