ITAC Assessment: MZ0083
ITAC logo
ITAC Assessment: MZ0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product pharmaceutical
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range less than $500
k
# of Employees 4
Plant Area 120,000
ft2
Annual Production 21,000,000
pieces
Production Hrs. Annual 6,900
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,716 1,339,205
kWh
Electricity Demand $7,695 2,917
kW-mo/yr
Natural Gas $11,361 1,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3113: Make ice during off peak hours for cooling $2,727 $16,800 - $2,727
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,272 $900 $9,774
143,742
kWh
$497
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $8,851 - - - $8,851
-
MMBtu
04 2.7135: Install occupancy sensors $2,103 $335 $1,852
20,576
kWh
$252
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,933 $11,000 $5,573
78,488
kWh
$360
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,886 $29,035 $17,199
242,806
kWh
$3,835
-
kW-mo/yr
$8,851
-
MMBtu
TOTAL IMPLEMENTED $18,308 $12,235 $17,199
242,806
kWh
$1,109
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs