| Assessment Year | 2012 |
|---|---|
| Principal Product | pharmaceutical |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | less than $500 k |
| # of Employees | 4 |
| Plant Area |
120,000
ft2
|
| Annual Production | 21,000,000
pieces
|
| Production Hrs. Annual | 6,900
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $94,716 | 1,339,205 |
kWh
|
$0.071 |
| Electricity Demand | $7,695 | 2,917 |
kW-mo/yr
|
$2.64 |
| Natural Gas | $11,361 | 1,234 |
MMBtu
|
$9.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,886 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,308 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3113: Make ice during off peak hours for cooling | $2,727 | $16,800 | - |
$2,727
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,272 | $900 |
$9,774
143,742
kWh
|
$497
-
kW-mo/yr
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,851 | - | - | - |
$8,851
-
MMBtu
|
|
| 04 | 2.7135: Install occupancy sensors | $2,103 | $335 |
$1,852
20,576
kWh
|
$252
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,933 | $11,000 |
$5,573
78,488
kWh
|
$360
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $29,886 | $29,035 |
$17,199
242,806
kWh
|
$3,835
-
kW-mo/yr
|
$8,851
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,308 | $12,235 |
$17,199
242,806
kWh
|
$1,109
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs