Assessment Year | 2012 |
---|---|
Principal Product | pharmaceutical |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | less than $500 k |
# of Employees | 4 |
Plant Area |
120,000
ft2
|
Annual Production | 21,000,000
pieces
|
Production Hrs. Annual | 6,900
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,716 | 1,339,205 |
kWh
|
$0.071 |
Electricity Demand | $7,695 | 2,917 |
kW-mo/yr
|
$2.64 |
Natural Gas | $11,361 | 1,234 |
MMBtu
|
$9.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,886 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,308 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3113: Make ice during off peak hours for cooling | $2,727 | $16,800 | - |
$2,727
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,272 | $900 |
$9,774
143,742
kWh
|
$497
-
kW-mo/yr
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,851 | - | - | - |
$8,851
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $2,103 | $335 |
$1,852
20,576
kWh
|
$252
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,933 | $11,000 |
$5,573
78,488
kWh
|
$360
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $29,886 | $29,035 |
$17,199
242,806
kWh
|
$3,835
-
kW-mo/yr
|
$8,851
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,308 | $12,235 |
$17,199
242,806
kWh
|
$1,109
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs