ITAC Assessment: MUCM16
ITAC logo
ITAC Assessment: MUCM16
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product None
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 30
Plant Area 40,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,828 248,151
kWh
Electricity Fees $21,065 -
Natural Gas $20,806 1,892
MMBtu
TOTAL YEARLY COSTS $85,700
RECOMMENDED SAVINGS* $3,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $915 $5,855 $915
5,082
kWh
-
02 2.7134: Use photocell controls $28 $96 $28
154
kWh
-
03 2.7135: Install occupancy sensors $492 $821 $492
2,733
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $871 $293 $871
4,837
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $512 $1,289 - $512
-
MMBtu
06 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $20 $122 - $20
-
MMBtu
07 2.7496: Install partitions to reduce size of conditioned space $184 $1,268 - $184
-
MMBtu
TOTAL RECOMMENDED $3,021 $9,743 $2,305
12,806
kWh
$716
-
MMBtu
TOTAL IMPLEMENTED $1,990 $7,537 $1,785
9,919
kWh
$204
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs