*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Specialized aluminum parts
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 193
Plant Area 342,310
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,022 7,924,000
kWh
Electricity Demand $158,110 39,469
kW-mo/yr
Electricity Fees $579,320 -
Natural Gas $390,439 43,267
MMBtu
Waste Disposal Costs
Water Usage $17,801 366,582
Tgal
Water Disposal $37,293 366,582
Tgal
TOTAL YEARLY COSTS $1,590,985
RECOMMENDED SAVINGS* $11,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $1,490 $18 - $1,490
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $814 $270 $814
16,321
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $6,285 $5,918 $6,285
104,750
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $2,201 - $2,201
36,686
kWh
-
05 2.7135: Install occupancy sensors $872 $524 $872
14,527
kWh
-
TOTAL RECOMMENDED $11,662 $6,730 $10,172
172,284
kWh
$1,490
-
MMBtu
TOTAL IMPLEMENTED - - - -