ITAC Assessment: MU0019
ITAC logo
ITAC Assessment: MU0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Iron casting provider (foundry)
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 170,000
ft2
Annual Production 15,900
ton
Production Hrs. Annual 2,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $963,264 21,279,945
kWh
Electricity Demand $846,552 51,950
kW-mo/yr
Electricity Fees $(-109,719.0) -
Natural Gas $787,876 156,714
MMBtu
Waste Disposal Costs
Water Usage $241,635 30,077
Tgal
TOTAL YEARLY COSTS $2,729,608
RECOMMENDED SAVINGS* $47,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $306 $40 $204
4,528
kWh
$102
-
kW-mo/yr
02 2.7134: Use photocell controls $386 $133 $258
5,731
kWh
$128
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $45,007 $800 $17,861
396,914
kWh
$27,146
-
kW-mo/yr
04 2.6211: Conserve energy by efficient use of vending machines $1,514 $610 $1,012
22,491
kWh
$502
-
kW-mo/yr
TOTAL RECOMMENDED $47,213 $1,583 $19,335
429,664
kWh
$27,878
-
kW-mo/yr
TOTAL IMPLEMENTED $45,007 $800 $17,861
396,914
kWh
$27,146
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs