ITAC Assessment: MS0435
ITAC logo
ITAC Assessment: MS0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Hydraulic/Fuel Tanks
NAICS 332313: Plate Work Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 80,000
ft2
Annual Production 18,341
units
Production Hrs. Annual 3,325
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,784 2,065,600
kWh
Electricity Demand $32,108 8,208
kW-mo/yr
Electricity Fees $(-6,736.8) -
LPG $18,620 915
MMBtu
Waste Disposal Costs
Water Usage $2,953 500
Tgal
TOTAL YEARLY COSTS $269,728
RECOMMENDED SAVINGS* $153,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings LPG Savings
01 2.7132: Install timers on light switches in little used areas $37,679 $1,527 $37,679
342,535
kWh
- -
02 2.9114: Use solar heat to make electricty $101,423 $659,750 $101,423
922,025
kWh
- -
03 2.1321: Replace fossil fuel equipment with electrical equipment $10,911 $100,000 $(-7,708.8)
(-70,080)
kWh
- $18,620
-
MMBtu
04 2.8114: Change rate schedules or other changes in utility service $3,222 - - $3,222 -
05 2.3212: Optimize plant power factor $609 $2,713 - $609 -
TOTAL RECOMMENDED $153,844 $763,990 $131,393
1,194,480
kWh
$3,831 $18,620
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs