ITAC Assessment: MS0232
ITAC logo
ITAC Assessment: MS0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Potted plants
NAICS 111422: Floriculture Production
SIC 181:
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 230,062
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 3,640
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,208 466,560
kWh
Electricity Fees $513 -
Natural Gas $104,811 20,643
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Wood Savings Personnel Changes Savings
01 2.1224: Replace boiler $60,123 $97,000 - - $91,059
-
MMBtu
$(-15,936.0)
-
MMBtu
$(-15,000.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $240 $450 $236
3,295
kWh
$4 - - -
TOTAL RECOMMENDED $60,363 $97,450 $236
3,295
kWh
$4 $91,059
-
MMBtu
$(-15,936.0)
-
MMBtu
$(-15,000.0)
TOTAL IMPLEMENTED $60,123 $97,000 - - $91,059
-
MMBtu
$(-15,936.0)
-
MMBtu
$(-15,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs