| Assessment Year | 2001 |
|---|---|
| Principal Product | Low-Alloy Steel Castings |
| NAICS |
n/a
|
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
197,800
ft2
|
| Annual Production | 11,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,254 | 21,322,611 |
kWh
|
$0.003 |
| Electricity Demand | $255,028 | 115,782 |
kW-mo/yr
|
$2.20 |
| Electricity Fees | $528,597 | - |
|
- |
| Natural Gas | $597,839 | 89,432 |
MMBtu
|
$6.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $136,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,220 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $35,695 | $1,000 | - | - | - |
$35,695
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,525 | $1,000 | - | - | - |
$10,525
-
MMBtu
|
|
| 03 | 2.2442: Preheat combustion air with waste heat | $67,125 | $17,280 | - | - | - |
$67,125
-
MMBtu
|
|
| 04 | 2.2442: Preheat combustion air with waste heat | $14,314 | $5,040 | - | - | - |
$14,314
-
MMBtu
|
|
| 05 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $5,216 | $7,600 | - | - | - |
$5,216
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,218 | $367 |
$58
42,274
kWh
|
- | $1,160 | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $448 | $302 |
$20
11,127
kWh
|
$120
-
kW-mo/yr
|
$308 | - | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $2,135 | $2,916 |
$65
75,423
kWh
|
- | $2,070 | - | |
| TOTAL RECOMMENDED | $136,676 | $35,505 |
$143
128,824
kWh
|
$120
-
kW-mo/yr
|
$3,538 |
$132,875
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $46,220 | $2,000 | - | - | - |
$46,220
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs