Assessment Year | 2001 |
---|---|
Principal Product | Low-Alloy Steel Castings |
NAICS |
n/a
|
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
197,800
ft2
|
Annual Production | 11,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,254 | 21,322,611 |
kWh
|
$0.003 |
Electricity Demand | $255,028 | 115,782 |
kW-mo/yr
|
$2.20 |
Electricity Fees | $528,597 | - |
|
- |
Natural Gas | $597,839 | 89,432 |
MMBtu
|
$6.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $136,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,220 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $35,695 | $1,000 | - | - | - |
$35,695
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,525 | $1,000 | - | - | - |
$10,525
-
MMBtu
|
|
03 | 2.2442: Preheat combustion air with waste heat | $67,125 | $17,280 | - | - | - |
$67,125
-
MMBtu
|
|
04 | 2.2442: Preheat combustion air with waste heat | $14,314 | $5,040 | - | - | - |
$14,314
-
MMBtu
|
|
05 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $5,216 | $7,600 | - | - | - |
$5,216
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,218 | $367 |
$58
42,274
kWh
|
- | $1,160 | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $448 | $302 |
$20
11,127
kWh
|
$120
-
kW-mo/yr
|
$308 | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $2,135 | $2,916 |
$65
75,423
kWh
|
- | $2,070 | - | |
TOTAL RECOMMENDED | $136,676 | $35,505 |
$143
128,824
kWh
|
$120
-
kW-mo/yr
|
$3,538 |
$132,875
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,220 | $2,000 | - | - | - |
$46,220
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs