| Assessment Year | 2000 |
|---|---|
| Principal Product | Residential A-Coil Evaporators |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 525 |
| Plant Area |
350,000
ft2
|
| Annual Production | 808,000
pieces
|
| Production Hrs. Annual | 6,520
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $367,567 | 10,919,988 |
kWh
|
$0.034 |
| Electricity Demand | $219,432 | 26,030 |
kW-mo/yr
|
$8.43 |
| Electricity Fees | $(-5,811.0) | - |
|
- |
| Natural Gas | $46,031 | 15,234 |
MMBtu
|
$3.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $118,720 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $79,890 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $31,264 | $583 |
$20,015
594,666
kWh
|
$10,787
-
kW-mo/yr
|
$462 | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,681 | $200 |
$5,597
166,178
kWh
|
- | $84 | - | - | |
| 03 | 2.3132: Recharge batteries on during off-peak demand periods | $7,566 | - | - |
$7,454
-
kW-mo/yr
|
$112 | - | - | |
| 04 | 3.4111: Use closed cycle process to minimize waste water production | $74,209 | $6,000 | - | - | - |
$23,960
-
Tgal
|
$50,249
-
Tgal
|
|
| TOTAL RECOMMENDED | $118,720 | $6,783 |
$25,612
760,844
kWh
|
$18,241
-
kW-mo/yr
|
$658 |
$23,960
-
Tgal
|
$50,249
-
Tgal
|
||
| TOTAL IMPLEMENTED | $79,890 | $6,200 |
$5,597
166,178
kWh
|
- | $84 |
$23,960
-
Tgal
|
$50,249
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs