ITAC Assessment: MS0070
ITAC logo
ITAC Assessment: MS0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product File Folders, Computer Paper, and Paper Pads
NAICS
n/a
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 294,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,464 5,021,395
kWh
Electricity Demand $37,683 11,008
kW-mo/yr
Electricity Fees $80,360 -
Natural Gas $59,392 12,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.2437: Recover waste heat from equipment $5,086 $3,378 - - - $5,086
-
MMBtu
- -
02 2.7134: Use photocell controls $3,429 $402 $2,898
65,944
kWh
- $531 - - -
03 2.6214: Shut off pilots in standby equipment $2,600 $120 - - - $2,600
-
MMBtu
- -
04 2.7122: Disconnect ballasts $2,838 $40 $2,097
47,773
kWh
$238
-
kW-mo/yr
$503 - - -
05 3.1192: Reduce scrap production $39,200 $2,000 - - - - $(-5,600.0)
-
lb
$44,800
TOTAL RECOMMENDED $53,153 $5,940 $4,995
113,717
kWh
$238
-
kW-mo/yr
$1,034 $7,686
-
MMBtu
$(-5,600.0)
-
lb
$44,800
TOTAL IMPLEMENTED $44,638 $2,160 $2,097
47,773
kWh
$238
-
kW-mo/yr
$503 $2,600
-
MMBtu
$(-5,600.0)
-
lb
$44,800
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs