ITAC Assessment: MS0026
ITAC logo
ITAC Assessment: MS0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Molded Automotive Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,904 6,044,256
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2628: Utilize a less expensive cooling method $38,516 $124,340 $38,516
701,934
kWh
02 2.2511: Insulate bare equipment $5,499 $9,280 $5,499
136,870
kWh
03 2.7241: Install outside air damper / economizer on hvac unit $30,539 $35,000 $30,539
759,672
kWh
04 2.4133: Use most efficient type of electric motors $2,419 $15,700 $2,419
36,049
kWh
05 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency $4,009 $3,000 $4,009
75,029
kWh
TOTAL RECOMMENDED $80,982 $187,320 $80,982
1,709,554
kWh
TOTAL IMPLEMENTED $2,419 $15,700 $2,419
36,049
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs