ITAC Assessment: MO0103
ITAC logo
ITAC Assessment: MO0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Buns
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 47,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,185 2,340,563
kWh
Natural Gas $117,615 23,445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $5,408 $8,467 $5,408
94,959
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,255 $230 $1,255
21,981
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,608 $4,638 $2,608
45,721
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,379 $319 $2,379
41,911
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,464 $180 $3,464
60,961
kWh
-
06 2.2437: Recover waste heat from equipment $1,717 $1,497 - $1,717
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,195 $1,195 - $2,195
-
MMBtu
TOTAL RECOMMENDED $19,026 $16,526 $15,114
265,533
kWh
$3,912
-
MMBtu
TOTAL IMPLEMENTED $14,701 $10,391 $12,506
219,812
kWh
$2,195
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs