ITAC Assessment: MI0184
ITAC logo
ITAC Assessment: MI0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Canned Seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 200,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,107,648 6,433,416
kWh
Electricity Demand $129,720 16,847
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.6218: Turn off equipment when not in use $60,788 $640 $52,811
528,156
kWh
$7,977
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $34,867 $1,500 - - $34,867
-
MMBtu
03 2.4323: Use optimum size and capacity equipment $9,578 $320 $8,316
48,917
kWh
$1,262
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,667 $80 $4,818
28,343
kWh
$849
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,350 $920 $4,882
28,715
kWh
$468
-
kW-mo/yr
-
TOTAL RECOMMENDED $116,250 $3,460 $70,827
634,131
kWh
$10,556
-
kW-mo/yr
$34,867
-
MMBtu
TOTAL IMPLEMENTED $110,583 $3,380 $66,009
605,788
kWh
$9,707
-
kW-mo/yr
$34,867
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs