Assessment Year | 2007 |
---|---|
Principal Product | Medical Plastic Products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
30,000
ft2
|
Annual Production | 367,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $727,679 | 5,313,000 |
kWh
|
$0.14 |
Electricity Demand | $84,826 | 10,736 |
kW-mo/yr
|
$7.90 |
Electricity Fees | $473 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $140,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $91,231 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $46,436 | $1,955 |
$46,128
329,484
kWh
|
$308
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $67,528 | $120 |
$62,440
446,021
kWh
|
$5,088
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,594 | $20,498 |
$18,184
129,886
kWh
|
$1,410
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,109 | $1,074 |
$3,869
27,639
kWh
|
$240
-
kW-mo/yr
|
|
05 | 2.4323: Use optimum size and capacity equipment | $1,528 | $3,010 |
$1,424
9,429
kWh
|
$104
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,331 | $30 |
$1,183
8,450
kWh
|
$148
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $140,526 | $26,687 |
$133,228
950,909
kWh
|
$7,298
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $91,231 | $21,692 |
$84,493
603,546
kWh
|
$6,738
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs