ITAC Assessment: MI0085
ITAC logo
ITAC Assessment: MI0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Automotive wiper blades
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 85,000
ft2
Annual Production 3,750,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,953 1,964,160
kWh
Electricity Demand $39,707 4,986
kW-mo/yr
Electricity Fees $15,201 -
Natural Gas $70,282 7,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $8,514 $2,300 $8,514
143,403
kWh
- - - -
02 2.8114: Change rate schedules or other changes in utility service $21,699 $1,200 - - - $21,699 -
03 2.2136: Install / repair insulation on steam lines $868 - - $868
-
MMBtu
- - -
04 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,834 $130 $131
2,495
kWh
$1,703
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $(-19.0) $2,670 $2,061
39,169
kWh
- $(-2,080.0) - -
06 4.432: Cross-train personnel to avoid lost time $20,000 - - - - - $20,000
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $263 $102 $263
5,005
kWh
- - - -
TOTAL RECOMMENDED $53,159 $6,402 $10,969
190,072
kWh
$2,571
-
MMBtu
$(-2,080.0) $21,699 $20,000
TOTAL IMPLEMENTED $32,291 $6,402 $10,969
190,072
kWh
$1,703
-
MMBtu
$(-2,080.0) $21,699 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs