ITAC Assessment: ME0284
ITAC logo
ITAC Assessment: ME0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fabricated Structural Steel
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 61,600
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 3,200
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,933 634,232
kWh
Electricity Demand $32,110 3,674
kW-mo/yr
LPG $3,152 321
MMBtu
Fuel Oil #2 $11,315 3,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,752 $16,593 $6,132
87,632
kWh
$5,908
-
kW-mo/yr
$(-2,288.0)
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,586 $8,987 $9,586
112,251
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,090 $15,253 $3,574
44,549
kWh
$1,516
-
kW-mo/yr
- -
04 2.1331: Burn a less expensive grade of fuel $2,969 $250 $2,969
37,222
kWh
- - -
05 3.4151: Minimize water usage $992 $105 $571
7,034
kWh
- - $421
-
Tgal
TOTAL RECOMMENDED $28,389 $41,188 $22,832
288,688
kWh
$7,424
-
kW-mo/yr
$(-2,288.0)
-
MMBtu
$421
-
Tgal
TOTAL IMPLEMENTED $14,676 $24,240 $13,160
156,800
kWh
$1,516
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs