Assessment Year | 2000 |
---|---|
Principal Product | Fabricated Structural Steel |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
61,600
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 3,200
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,933 | 634,232 |
kWh
|
$0.13 |
Electricity Demand | $32,110 | 3,674 |
kW-mo/yr
|
$8.74 |
LPG | $3,152 | 321 |
MMBtu
|
$9.82 |
Fuel Oil #2 | $11,315 | 3,275 |
MMBtu
|
$3.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,676 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,752 | $16,593 |
$6,132
87,632
kWh
|
$5,908
-
kW-mo/yr
|
$(-2,288.0)
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,586 | $8,987 |
$9,586
112,251
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,090 | $15,253 |
$3,574
44,549
kWh
|
$1,516
-
kW-mo/yr
|
- | - | |
04 | 2.1331: Burn a less expensive grade of fuel | $2,969 | $250 |
$2,969
37,222
kWh
|
- | - | - | |
05 | 3.4151: Minimize water usage | $992 | $105 |
$571
7,034
kWh
|
- | - |
$421
-
Tgal
|
|
TOTAL RECOMMENDED | $28,389 | $41,188 |
$22,832
288,688
kWh
|
$7,424
-
kW-mo/yr
|
$(-2,288.0)
-
MMBtu
|
$421
-
Tgal
|
||
TOTAL IMPLEMENTED | $14,676 | $24,240 |
$13,160
156,800
kWh
|
$1,516
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs