ITAC Assessment: MAS034
ITAC logo
ITAC Assessment: MAS034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Motors and Motor Controls
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 140,000
ft2
Annual Production 60
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,914 1,533,624
kWh
Electricity Demand $91,660 6,513
kW-mo/yr
Electricity Fees $4,659 -
Natural Gas $72,034 6,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $19,479 $19,600 $19,479
180,032
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,681 $23,000 $13,925
128,700
kWh
$(-6,244.0)
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,178 $7,500 $4,178
38,610
kWh
-
04 2.7135: Install occupancy sensors $760 $1,600 $760
7,021
kWh
-
TOTAL RECOMMENDED $32,098 $51,700 $38,342
354,363
kWh
$(-6,244.0)
-
MMBtu
TOTAL IMPLEMENTED $4,178 $7,500 $4,178
38,610
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs