ITAC Assessment: MAS019
ITAC logo
ITAC Assessment: MAS019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Paper Converting
NAICS 322230: Stationery Product Manufacturing
SIC 2678: Stationery, Tablets, and Related Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 144,000
ft2
Annual Production 15,600,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,534 1,399,982
kWh
Electricity Demand $61,040 4,951
kW-mo/yr
Electricity Fees $8,400 -
Natural Gas $54,228 4,370
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,186 $1,500 $4,186
39,718
kWh
- -
02 2.7314: Reduce ventilation air $2,999 $1,535 $1,299
12,324
kWh
- $1,700
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $1,233 $2,507 $1,233
11,700
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $1,117 - - - $1,117
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $375 - $280
2,662
kWh
$95
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,910 $5,542 $6,998
66,404
kWh
$95
-
kW-mo/yr
$2,817
-
MMBtu
TOTAL IMPLEMENTED $5,678 $1,500 $4,466
42,380
kWh
$95
-
kW-mo/yr
$1,117
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs