| Assessment Year | 2023 |
|---|---|
| Principal Product | Municipal Wastewater Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 7 |
| Plant Area |
215,000
ft2
|
| Annual Production | 640,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $351,462 | 2,530,400 |
kWh
|
$0.14 |
| Electricity Demand | $41,784 | 4,760 |
kW-mo/yr
|
$8.78 |
| Natural Gas | $33,037 | 1,933 |
MMBtu
|
$17.09 |
| TOTAL YEARLY COSTS | $426,283 | |||
| RECOMMENDED SAVINGS* | $105,123 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,262 | $30,900 |
$28,769
206,971
kWh
|
$2,493
-
kW-mo/yr
|
- | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,114 | $20,600 |
$26,797
192,782
kWh
|
$2,317
-
kW-mo/yr
|
- | - | |
| 03 | 3.1191: Change procedures / equipment / operating conditions | $24,241 | $55,000 |
$22,310
160,500
kWh
|
$1,931
-
kW-mo/yr
|
- | - | |
| 04 | 2.9114: Use solar heat to make electricty | $11,416 | $78,169 |
$6,806
48,962
kWh
|
$1,159
-
kW-mo/yr
|
- | $3,451 | |
| 05 | 2.7234: Use heat pump for space conditioning | $4,461 | $14,400 |
$4,110
29,565
kWh
|
$351
-
kW-mo/yr
|
- | - | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $3,059 | $800 | - | - |
$3,059
-
MMBtu
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,570 | $2,160 |
$1,210
8,704
kWh
|
$360
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $105,123 | $202,029 |
$90,002
647,484
kWh
|
$8,611
-
kW-mo/yr
|
$3,059
-
MMBtu
|
$3,451 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs