ITAC Assessment: MA0833
ITAC logo
ITAC Assessment: MA0833
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wastewater transfer
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 3
Plant Area 5,400
ft2
Annual Production 50,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,449 335,360
kWh
Electricity Demand $41,973 1,564
kW-mo/yr
Electricity Fees $216 -
Fuel Oil #2 $30,268 2,384
MMBtu
TOTAL YEARLY COSTS $122,906
RECOMMENDED SAVINGS* $45,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,585

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,117 $6,950 $19,837
132,247
kWh
- $9,280
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $10,258 $840 - - $10,258
-
MMBtu
03 2.7234: Use heat pump for space conditioning $5,709 $2,500 $4,582
30,551
kWh
$1,127
-
kW-mo/yr
-
04 2.7234: Use heat pump for space conditioning $618 $94,050 $(-23,800.0)
(-158,664)
kWh
$(-5,850.0)
-
kW-mo/yr
$30,268
-
MMBtu
TOTAL RECOMMENDED $45,702 $104,340 $619
4,134
kWh
$(-4,723.0)
-
kW-mo/yr
$49,806
-
MMBtu
TOTAL IMPLEMENTED $16,585 $97,390 $(-19,218.0)
(-128,113)
kWh
$(-4,723.0)
-
kW-mo/yr
$40,526
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs