| Assessment Year | 2022 |
|---|---|
| Principal Product | Wastewater transfer |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 3 |
| Plant Area |
5,400
ft2
|
| Annual Production | 50,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,449 | 335,360 |
kWh
|
$0.15 |
| Electricity Demand | $41,973 | 1,564 |
kW-mo/yr
|
$26.84 |
| Electricity Fees | $216 | - |
|
- |
| Fuel Oil #2 | $30,268 | 2,384 |
MMBtu
|
$12.70 |
| TOTAL YEARLY COSTS | $122,906 | |||
| RECOMMENDED SAVINGS* | $45,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,585 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,117 | $6,950 |
$19,837
132,247
kWh
|
- |
$9,280
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $10,258 | $840 | - | - |
$10,258
-
MMBtu
|
|
| 03 | 2.7234: Use heat pump for space conditioning | $5,709 | $2,500 |
$4,582
30,551
kWh
|
$1,127
-
kW-mo/yr
|
- | |
| 04 | 2.7234: Use heat pump for space conditioning | $618 | $94,050 |
$(-23,800.0)
(-158,664)
kWh
|
$(-5,850.0)
-
kW-mo/yr
|
$30,268
-
MMBtu
|
|
| TOTAL RECOMMENDED | $45,702 | $104,340 |
$619
4,134
kWh
|
$(-4,723.0)
-
kW-mo/yr
|
$49,806
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,585 | $97,390 |
$(-19,218.0)
(-128,113)
kWh
|
$(-4,723.0)
-
kW-mo/yr
|
$40,526
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs