ITAC Assessment: MA0822
ITAC logo
ITAC Assessment: MA0822
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 200,000
ft2
Annual Production 1,875,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,104 3,416,897
kWh
Electricity Demand $42,232 7,328
kW-mo/yr
Electricity Fees $713 -
Natural Gas $15,559 1,981
MMBtu
TOTAL YEARLY COSTS $557,608
RECOMMENDED SAVINGS* $87,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $78,975 $422,509 $71,742
491,381
kWh
$7,233
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,003 $6,741 $5,675
38,873
kWh
$328
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,485 $4,500 $1,332
4,556
kWh
$1,153
-
kW-mo/yr
TOTAL RECOMMENDED $87,463 $433,750 $78,749
534,810
kWh
$8,714
-
kW-mo/yr
TOTAL IMPLEMENTED $84,978 $429,250 $77,417
530,254
kWh
$7,561
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs