ITAC Assessment: MA0546
ITAC logo
ITAC Assessment: MA0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ceramic and metal components
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area 60,000
ft2
Annual Production 0
units
Production Hrs. Annual 87,112
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,224 3,696,200
kWh
Electricity Demand $25,980 8,776
kW-mo/yr
Electricity Fees $4,320 -
Natural Gas $55,558 7,278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,397

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $16,130 $4,480 $16,130
181,700
kWh
- - -
02 3.4114: Replace city water with recycled water via cooling tower $13,348 $4,712 n/a - - $10,378
-
Tgal
$2,970
03 2.2511: Insulate bare equipment $11,157 $1,992 $11,157
122,600
kWh
- - -
04 2.7314: Reduce ventilation air $7,495 $1,200 $4,457
50,700
kWh
$3,038
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,827 $4,972 $3,827
42,200
kWh
- - -
06 2.2437: Recover waste heat from equipment $2,243 $3,230 - $2,243
-
MMBtu
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,839 $282 $1,839
20,900
kWh
- - -
08 2.2531: Re-size charging openings or add movable cover or door $981 $720 - $981
-
MMBtu
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $832 $3,000 $832
8,700
kWh
- - -
TOTAL RECOMMENDED $57,852 $24,588 $38,242
426,800
kWh
$6,262
-
MMBtu
$10,378
-
Tgal
$2,970
TOTAL IMPLEMENTED $14,397 $12,402 $9,116
101,600
kWh
$5,281
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs