Assessment Year | 2004 |
---|---|
Principal Product | Ceramic and metal components |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 192 |
Plant Area |
60,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 87,112
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $352,224 | 3,696,200 |
kWh
|
$0.095 |
Electricity Demand | $25,980 | 8,776 |
kW-mo/yr
|
$2.96 |
Electricity Fees | $4,320 | - |
|
- |
Natural Gas | $55,558 | 7,278 |
MMBtu
|
$7.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,397 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $16,130 | $4,480 |
$16,130
181,700
kWh
|
- | - | - | |
02 | 3.4114: Replace city water with recycled water via cooling tower | $13,348 | $4,712 | n/a | - | - |
$10,378
-
Tgal
|
$2,970 |
03 | 2.2511: Insulate bare equipment | $11,157 | $1,992 |
$11,157
122,600
kWh
|
- | - | - | |
04 | 2.7314: Reduce ventilation air | $7,495 | $1,200 |
$4,457
50,700
kWh
|
$3,038
-
MMBtu
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,827 | $4,972 |
$3,827
42,200
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,243 | $3,230 | - |
$2,243
-
MMBtu
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,839 | $282 |
$1,839
20,900
kWh
|
- | - | - | |
08 | 2.2531: Re-size charging openings or add movable cover or door | $981 | $720 | - |
$981
-
MMBtu
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $832 | $3,000 |
$832
8,700
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $57,852 | $24,588 |
$38,242
426,800
kWh
|
$6,262
-
MMBtu
|
$10,378
-
Tgal
|
$2,970 | ||
TOTAL IMPLEMENTED | $14,397 | $12,402 |
$9,116
101,600
kWh
|
$5,281
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs