ITAC Assessment: MA0523
ITAC logo
ITAC Assessment: MA0523
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Custom Injection molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,750 1,629,000
kWh
Electricity Demand $29,532 5,028
kW-mo/yr
Electricity Fees $(-2,515.0) -
Natural Gas $14,282 1,445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 3.4114: Replace city water with recycled water via cooling tower $14,262 $23,900 $(-1,440.0)
(-15,218)
kWh
$(-407.0)
-
kW-mo/yr
- - $16,609
-
Tgal
$(-500.0)
02 2.3212: Optimize plant power factor $6,907 $11,770 - $6,907
-
kW-mo/yr
- - - -
03 2.6212: Turn off equipment during breaks, reduce operating time $2,108 - $132
1,397
kWh
- $1,976
-
MMBtu
- - -
04 4.821: Pay bills on time to avoid late fees $1,510 - - - - $1,510 - -
05 2.7224: Reduce space conditioning during non-working hours $1,423 $2,200 $858
6,446
kWh
- $565
-
MMBtu
- - -
06 2.7132: Install timers on light switches in little used areas $467 $250 $467
4,940
kWh
- - - - -
07 2.4133: Use most efficient type of electric motors $359 $230 $316
3,339
kWh
$43
-
kW-mo/yr
- - - -
08 2.4314: Use synthetic lubricant $308 - $308
2,238
kWh
- - - - -
TOTAL RECOMMENDED $27,344 $38,350 $641
3,142
kWh
$6,543
-
kW-mo/yr
$2,541
-
MMBtu
$1,510 $16,609
-
Tgal
$(-500.0)
TOTAL IMPLEMENTED $11,351 $12,250 $915
9,676
kWh
$6,950
-
kW-mo/yr
$1,976
-
MMBtu
$1,510 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs