| Assessment Year | 1996 |
|---|---|
| Principal Product | plastic automotive parts |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 216 |
| Plant Area |
48,000
ft2
|
| Annual Production | 1,417,500
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $669,901 | 8,450,469 |
kWh
|
$0.079 |
| Electricity Demand | $70,892 | 9,009 |
kW-mo/yr
|
$7.87 |
| Electricity Fees | $2,533 | - |
|
- |
| Natural Gas | $59,729 | 12,195 |
MMBtu
|
$4.90 |
| LPG | $120,006 | 18,717 |
MMBtu
|
$6.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $421,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $321,166 | $27,000 |
$(-1,134.0)
(-14,947)
kWh
|
- | $(-30,000.0) | $379,400 | $(-27,100.0) | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,771 | $146,000 |
$52,771
665,006
kWh
|
- | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,513 | $32,940 |
$20,513
258,499
kWh
|
- | - | - | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,249 | $90,000 |
$20,699
260,844
kWh
|
$(-4,450.0)
-
MMBtu
|
- | - | - | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,599 | $18,000 |
$13,722
172,919
kWh
|
$(-3,123.0)
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $421,298 | $313,940 |
$106,571
1,342,321
kWh
|
$(-7,573.0)
-
MMBtu
|
$(-30,000.0) | $379,400 | $(-27,100.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs