ITAC Assessment: MA0370
ITAC logo
ITAC Assessment: MA0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product plastic automotive parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 216
Plant Area 48,000
ft2
Annual Production 1,417,500
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $669,901 8,450,469
kWh
Electricity Demand $70,892 9,009
kW-mo/yr
Electricity Fees $2,533 -
Natural Gas $59,729 12,195
MMBtu
LPG $120,006 18,717
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $421,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $321,166 $27,000 $(-1,134.0)
(-14,947)
kWh
- $(-30,000.0) $379,400 $(-27,100.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,771 $146,000 $52,771
665,006
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,513 $32,940 $20,513
258,499
kWh
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,249 $90,000 $20,699
260,844
kWh
$(-4,450.0)
-
MMBtu
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,599 $18,000 $13,722
172,919
kWh
$(-3,123.0)
-
MMBtu
- - -
TOTAL RECOMMENDED $421,298 $313,940 $106,571
1,342,321
kWh
$(-7,573.0)
-
MMBtu
$(-30,000.0) $379,400 $(-27,100.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs