Assessment Year | 1996 |
---|---|
Principal Product | plastic automotive parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 216 |
Plant Area |
48,000
ft2
|
Annual Production | 1,417,500
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $669,901 | 8,450,469 |
kWh
|
$0.079 |
Electricity Demand | $70,892 | 9,009 |
kW-mo/yr
|
$7.87 |
Electricity Fees | $2,533 | - |
|
- |
Natural Gas | $59,729 | 12,195 |
MMBtu
|
$4.90 |
LPG | $120,006 | 18,717 |
MMBtu
|
$6.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $421,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $321,166 | $27,000 |
$(-1,134.0)
(-14,947)
kWh
|
- | $(-30,000.0) | $379,400 | $(-27,100.0) | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,771 | $146,000 |
$52,771
665,006
kWh
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,513 | $32,940 |
$20,513
258,499
kWh
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,249 | $90,000 |
$20,699
260,844
kWh
|
$(-4,450.0)
-
MMBtu
|
- | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,599 | $18,000 |
$13,722
172,919
kWh
|
$(-3,123.0)
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $421,298 | $313,940 |
$106,571
1,342,321
kWh
|
$(-7,573.0)
-
MMBtu
|
$(-30,000.0) | $379,400 | $(-27,100.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs