ITAC Assessment: MA0297
ITAC logo
ITAC Assessment: MA0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Aluminum components
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 79,862
ft2
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,790 895,369
kWh
Natural Gas $61,768 12,833
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $10,409 $15,400 - $10,409
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,461 $30 $3,461
29,015
kWh
-
03 2.2531: Re-size charging openings or add movable cover or door $3,339 $5,980 - $3,339
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $795 $816 - $795
-
MMBtu
05 2.2437: Recover waste heat from equipment $60 $594 - $60
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $245 - $245
2,052
kWh
-
TOTAL RECOMMENDED $18,309 $22,820 $3,706
31,067
kWh
$14,603
-
MMBtu
TOTAL IMPLEMENTED $4,501 $846 $3,706
31,067
kWh
$795
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs