ITAC Assessment: MA0288
ITAC logo
ITAC Assessment: MA0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product plain teflon hose
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 300,000
ft2
Annual Production 600,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $885,331 9,746,483
kWh
Natural Gas $188,729 54,519
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 3.4115: Recover and reuse cooling water $31,246 $14,546 $(-9,226.0)
(-101,700)
kWh
- $40,472
-
Tgal
02 2.2511: Insulate bare equipment $12,032 - $12,032
132,474
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,138 $6,840 $5,138
56,565
kWh
- -
04 2.2437: Recover waste heat from equipment $2,436 $9,790 - $2,436
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,263 - $2,263
24,912
kWh
- -
TOTAL RECOMMENDED $53,115 $31,176 $10,207
112,251
kWh
$2,436
-
MMBtu
$40,472
-
Tgal
TOTAL IMPLEMENTED $2,263 - $2,263
24,912
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs