ITAC Assessment: MA0264
ITAC logo
ITAC Assessment: MA0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Filter Paper Products
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 106,762
ft2
Annual Production 125
ton
Production Hrs. Annual 2,210
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,657 1,392,145
kWh
Fuel Oil #4 $11,783 2,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,121 $9,386 $7,121
77,667
kWh
02 2.7135: Install occupancy sensors $3,896 $1,274 $3,896
42,497
kWh
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,443 $1,176 $2,443
33,118
kWh
04 2.7221: Lower temperature during the winter season and vice-versa $1,451 $1,500 $1,451
15,826
kWh
05 2.5194: Redesign process $457 - $457
4,982
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $134 $180 $134
1,465
kWh
TOTAL RECOMMENDED $15,502 $13,516 $15,502
175,555
kWh
TOTAL IMPLEMENTED $14,911 $13,336 $14,911
169,108
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs