Assessment Year | 1993 |
---|---|
Principal Product | Ulta-sonic cleaning equi |
NAICS |
n/a
|
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $5 M to 10M |
# of Employees | 56 |
Plant Area |
41,000
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,283 | 464,537 |
kWh
|
$0.14 |
LPG | $7,920 | 1,209 |
MMBtu
|
$6.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.3135: Schedule routine maintenance during non-operating periods | $2,400 | $120 |
$2,400
-
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $838 | $1,562 | - |
$838
-
MMBtu
|
|
03 | 2.7111: Reduce illumination to minimum necessary levels | $741 | $18 |
$741
5,275
kWh
|
- | |
04 | 2.7496: Install partitions to reduce size of conditioned space | $557 | $720 | - |
$557
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $459 | $1,800 |
$577
4,103
kWh
|
$(-118.0)
-
MMBtu
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $207 | - |
$207
1,465
kWh
|
- | |
TOTAL RECOMMENDED | $5,202 | $4,220 |
$3,925
10,843
kWh
|
$1,277
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,445 | $1,682 |
$2,607
1,465
kWh
|
$838
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs