ITAC Assessment: MA0263
ITAC logo
ITAC Assessment: MA0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ulta-sonic cleaning equi
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 41,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,283 464,537
kWh
LPG $7,920 1,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.3135: Schedule routine maintenance during non-operating periods $2,400 $120 $2,400
-
kWh
-
02 2.2437: Recover waste heat from equipment $838 $1,562 - $838
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $741 $18 $741
5,275
kWh
-
04 2.7496: Install partitions to reduce size of conditioned space $557 $720 - $557
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $459 $1,800 $577
4,103
kWh
$(-118.0)
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $207 - $207
1,465
kWh
-
TOTAL RECOMMENDED $5,202 $4,220 $3,925
10,843
kWh
$1,277
-
MMBtu
TOTAL IMPLEMENTED $3,445 $1,682 $2,607
1,465
kWh
$838
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs