ITAC Assessment: MA0259
ITAC logo
ITAC Assessment: MA0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SMALL HARDWARE ITEMS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 55,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,091 1,473,623
kWh
Natural Gas $25,726 3,673
MMBtu
Fuel Oil #4 $57,514 13,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.6241: Reduce temperature of process equipment when on standby $8,134 - - $8,134
-
MMBtu
- -
02 2.1331: Burn a less expensive grade of fuel $3,084 - - $(-5,179.0)
-
MMBtu
$8,263
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $487 - $621
5,569
kWh
- - $(-134.0)
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $562 $509 $562
-
kWh
- - -
05 2.1213: Direct warmest air to combustion intake $686 $2,108 - - $686
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $584 - $584
5,275
kWh
- - -
07 2.2122: Install / repair insulation on condensate lines $396 $168 - - $396
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $292 $180 $292
2,638
kWh
- - -
TOTAL RECOMMENDED $14,225 $2,965 $2,059
13,482
kWh
$2,955
-
MMBtu
$9,345
-
MMBtu
$(-134.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs