| Assessment Year | 1992 |
|---|---|
| Principal Product | SMALL HARDWARE ITEMS |
| NAICS |
n/a
|
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
n/a
|
| Annual Production | 55,000,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $163,091 | 1,473,623 |
kWh
|
$0.11 |
| Natural Gas | $25,726 | 3,673 |
MMBtu
|
$7.00 |
| Fuel Oil #4 | $57,514 | 13,069 |
MMBtu
|
$4.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6241: Reduce temperature of process equipment when on standby | $8,134 | - | - |
$8,134
-
MMBtu
|
- | - | |
| 02 | 2.1331: Burn a less expensive grade of fuel | $3,084 | - | - |
$(-5,179.0)
-
MMBtu
|
$8,263
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $487 | - |
$621
5,569
kWh
|
- | - | $(-134.0) | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $562 | $509 |
$562
-
kWh
|
- | - | - | |
| 05 | 2.1213: Direct warmest air to combustion intake | $686 | $2,108 | - | - |
$686
-
MMBtu
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $584 | - |
$584
5,275
kWh
|
- | - | - | |
| 07 | 2.2122: Install / repair insulation on condensate lines | $396 | $168 | - | - |
$396
-
MMBtu
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $292 | $180 |
$292
2,638
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $14,225 | $2,965 |
$2,059
13,482
kWh
|
$2,955
-
MMBtu
|
$9,345
-
MMBtu
|
$(-134.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs