ITAC Assessment: MA0161
ITAC logo
ITAC Assessment: MA0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product AEROSOL & STICK SOLIDS
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 110,000
Tgal
Production Hrs. Annual 4,420
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $495,371 5,720,399
kWh
LPG $1,770 152
MMBtu
Fuel Oil #6 $128,935 50,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $335 $703 - - $335
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $476 $1,254 $562
7,034
kWh
- $(-86.0)
-
MMBtu
-
03 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $30,146 $123,000 $39,108
412,368
kWh
- $(-7,962.0)
-
MMBtu
$(-1,000.0)
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,375 $3,000 $3,140
38,980
kWh
$(-1,765.0)
-
MMBtu
- -
TOTAL RECOMMENDED $32,332 $127,957 $42,810
458,382
kWh
$(-1,765.0)
-
MMBtu
$(-7,713.0)
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $335 $703 - - $335
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs