ITAC Assessment: MA0111
ITAC logo
ITAC Assessment: MA0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PULP & PAPER MACHINERY
NAICS
n/a
SIC 3554: Paper Industries Machinery
Sales Range $1
M
to 5
M
# of Employees 56
Plant Area
n/a
Annual Production 2,600,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,891 1,690,211
kWh
LPG $41,083 8,766
MMBtu
Fuel Oil #2 $1,939 287
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,076

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,588 $3,792 $2,012
24,033
kWh
- $576
02 2.2491: Use cooling air which cools hot work pieces for space heating $1,579 - - $1,579
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $311 $78 $311
3,810
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $609 - $609
7,327
kWh
- -
05 2.4133: Use most efficient type of electric motors $722 $2,700 $722
8,499
kWh
- -
06 2.7494: Install storm windows and doors $1,177 $2,400 - $1,177
-
MMBtu
-
07 2.3192: Use fossil fuel powered generator during peak demand periods $66,605 - $60,442
363,130
kWh
$6,163
-
MMBtu
-
08 2.3191: Use demand controller or load shedder $30,000 $940 $30,000
-
kWh
- -
TOTAL RECOMMENDED $103,591 $9,910 $94,096
406,799
kWh
$8,919
-
MMBtu
$576
TOTAL IMPLEMENTED $34,076 $7,210 $32,323
27,843
kWh
$1,177
-
MMBtu
$576
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs