| Assessment Year | 1987 |
|---|---|
| Principal Product | PULP & PAPER MACHINERY |
| NAICS |
n/a
|
| SIC | 3554: Paper Industries Machinery |
| Sales Range | $1 M to 5M |
| # of Employees | 56 |
| Plant Area |
n/a
|
| Annual Production | 2,600,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $152,891 | 1,690,211 |
kWh
|
$0.090 |
| LPG | $41,083 | 8,766 |
MMBtu
|
$4.69 |
| Fuel Oil #2 | $1,939 | 287 |
MMBtu
|
$6.76 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $103,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,076 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,588 | $3,792 |
$2,012
24,033
kWh
|
- | $576 | |
| 02 | 2.2491: Use cooling air which cools hot work pieces for space heating | $1,579 | - | - |
$1,579
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $311 | $78 |
$311
3,810
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $609 | - |
$609
7,327
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $722 | $2,700 |
$722
8,499
kWh
|
- | - | |
| 06 | 2.7494: Install storm windows and doors | $1,177 | $2,400 | - |
$1,177
-
MMBtu
|
- | |
| 07 | 2.3192: Use fossil fuel powered generator during peak demand periods | $66,605 | - |
$60,442
363,130
kWh
|
$6,163
-
MMBtu
|
- | |
| 08 | 2.3191: Use demand controller or load shedder | $30,000 | $940 |
$30,000
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $103,591 | $9,910 |
$94,096
406,799
kWh
|
$8,919
-
MMBtu
|
$576 | ||
| TOTAL IMPLEMENTED | $34,076 | $7,210 |
$32,323
27,843
kWh
|
$1,177
-
MMBtu
|
$576 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs